POTENTIAL PROJECT PROGRAMMES

Bigger possibilities.
Clearly defined scopes.

Ten areas where MARENC can develop a technical concept, assemble specialist capabilities and propose a practical delivery structure.

Explore the scope
An industrial tank storage complex

10 programmes

Field engineer at a desert oil and gas processing facility
01 / OILFIELD PRODUCTION

Oilfield production improvement

Address separation, deposition and fluid-handling constraints through chemistry, process review and specialist packages.

Scope & success measures

Potential scope

Fluid testing · process assessment · controlled field trial

Measures to establish

Separation quality, treatment cost and operating stability

Discuss this programme ↗
Industrial storage tanks and access systems
02 / OILFIELD PRODUCTION

Heavy-crude mobility & transport

Evaluate chemical, thermal and equipment options against representative crude properties and transport conditions.

Scope & success measures

Potential scope

Rheology review · compatibility · transport concept

Measures to establish

Pressure drop, viscosity response and total treatment cost

Discuss this programme ↗
Oil and water separation testing
03 / WATER & RECOVERY

Produced water & reinjection

Integrate oil removal, solids control, compatible chemistry and injection-water requirements.

Scope & success measures

Potential scope

Water analysis · treatment train · qualification plan

Measures to establish

Oil and solids limits, injectivity risks and chemical consumption

Discuss this programme ↗
Industrial gas-treatment application
04 / OILFIELD PRODUCTION

H₂S & sour-fluid treatment

Select treatment approaches for sour gas or liquids with attention to composition, by-products and safe operation.

Scope & success measures

Potential scope

Composition review · process screening · specialist package

Measures to establish

Outlet specification, by-product handling and operating cost

Discuss this programme ↗
Gas recovery and compression process equipment
05 / POWER & ENERGY

Associated-gas recovery & utilisation

Assess gas gathering, treatment and power or process use with specialist gas-technology and generation partners.

Scope & success measures

Potential scope

Gas balance · treatment concept · offtake assessment

Measures to establish

Recoverable gas, required treatment and viable utilisation

Discuss this programme ↗
gas-turbine power station and electrical switchyard
06 / POWER & ENERGY

Power-plant performance improvement

Review plant utility constraints, water chemistry and selected upgrade opportunities with the relevant equipment specialists.

Scope & success measures

Potential scope

Baseline review · utility assessment · improvement package

Measures to establish

Availability, utility consumption and lifecycle cost

Discuss this programme ↗
Solar generation, battery storage and industrial power infrastructure
07 / POWER & ENERGY

Industrial & remote-site power

Develop generation, electrical distribution and hybrid options around load, fuel, grid access and continuity needs.

Scope & success measures

Potential scope

Load study · configuration options · delivery concept

Measures to establish

Dependable capacity, redundancy and cost of delivered power

Discuss this programme ↗
Membrane water-treatment application
08 / WATER & RECOVERY

Desalination & industrial water

Combine pretreatment, membranes, chemical programmes and residuals management around the required water quality.

Scope & success measures

Potential scope

Feed analysis · process selection · package integration

Measures to establish

Water quality, recovery, energy and chemical demand

Discuss this programme ↗
Resource-recovery process application
09 / WATER & RECOVERY

Wastewater reuse & resource recovery

Evaluate reuse and recoverable streams against process variability, treatment requirements and outlet value.

Scope & success measures

Potential scope

Stream characterisation · reuse options · pilot basis

Measures to establish

Reusable water, residuals burden and total operating cost

Discuss this programme ↗
Industrial steam and boiler utility systems
10 / INTEGRATED UTILITIES

Integrated industrial utilities

Connect water, steam, cooling, energy and chemical systems in a coordinated improvement programme.

Scope & success measures

Potential scope

Utility balance · interfaces · phased implementation

Measures to establish

Resource efficiency, reliability and lifecycle economics

Discuss this programme ↗

Start where the need
and capability meet.

Initial project development priorities include produced and injection water, oilfield separation and integrity, and power-plant water and utility performance. Larger generation and gas programmes are structured with the relevant qualified technology and delivery alliances.

See how we deliver

Let’s define your next step.

Share your operating challenge, location and project priorities.